★ Rated 4.8/5 by our customers · Read our reviews

Gift cards now available Learn more

Mendota  |  SKU: MEN4506

Dog Trainer Long Lead - 50 foot long drag lead

Regular price £22.99
Tax included
(12)


Delivery and Shipping

We send all orders by Royal Mail. This means that you will usually receive your goods within 3 business days of dispatch (normally sooner).

LeadingDog will dispatch your goods within 3 business day (normally sooner).

Business days are defined as any weekday (Monday, Tuesday, Wednesday, Thursday, Friday) excluding public or bank holidays.

The Royal Mail target time for international delivery varies country to country and is currently being affected by climate issues. The fastest service available will be used and although most countries aim is within  five working days this is not guaranteed and is subject to unforeseeable delays in transport and customs. Please note unless specifically requested Royal Mail will be used.

When ordering from outside of the UK your prices will not include VAT and any local taxes and duties are payable by recipient on receipt of the goods.  

Whilst every effort will be made to ensure that all items are in stock, this is sometimes not the case. If we are unable to dispatch your order within 3 days, we will contact you by email with an estimated dispatch date, offering you the chance to amend or cancel your order as you see fit.

Not sure on size? Contact us today for any assistance

Description

The Mendota Dog Trainer Long Lead is the trusted tool for serious recall and retrieving work. Available in 30-foot and 50-foot lengths, this drag lead gives your dog the freedom to explore while you maintain precise, on-command control. It’s the ultimate setup for shaping reliable come‑when‑called responses and smooth, consistent retrieves.

Durable, comfortable construction meets practical outdoor use. The lead is crafted from Mendota’s renowned multifilament polypropylene rope, the same trusted material across their training line. A UV‑coated finish guards against decay and fading, so the line stays strong and visible through seasons of sun, rain, and fieldwork. The hand portion is designed to feel gentle on your skin, so long training sessions don’t wear you down.

  • Two practical lengths: 30 ft and 50 ft options give you flexible training environments—from tight backyards to open parks.
  • Professional-grade rope: Mendota’s signature multifilament polypropylene rope delivers consistent performance under load and during extended sessions.
  • UV protection: The UV coating helps prevent decay and fading, extending the life of your drag lead even in bright sun.
  • Ergonomic, hand-friendly feel: A comfortable grip reduces fatigue so you can train longer and stay in tune with your dog.
  • Designed for recall and retrieve to hand: Specifically tuned to support come‑on‑command training and delivering the behavior to your hand reliably.

Use cases you can count on: practice recall in parks or wide-open spaces with gradual distance increases; work on retrieving to hand during structured fetch sessions; reinforce boundary training in your backyard, then transfer the behavior to real-world environments with confidence. This long lead helps you maintain control while giving your dog the freedom to explore, learn, and respond to cues consistently.

Why add this to your training toolkit? It’s built for results. The Mendota Dog Trainer Long Lead blends durability, comfort, and purpose-driven design so you get clear communication with your dog and measurable progress—without compromising safety or reliability. Ideal for professional trainers and devoted dog owners alike, it’s the go-to choice when you’re serious about recall accuracy and clean retrieves.

Tip: pair the long lead with positive reinforcement strategies and consistent cueing to maximize training efficiency. Keep the line clean, dry, and out of tangles between sessions, and store in a shaded area to preserve the UV coating and overall longevity.

Payment & Security

Payment methods

  • Apple Pay
  • Diners Club
  • Discover
  • Google Pay
  • Maestro
  • Mastercard
  • PayPal
  • Satispay
  • Shop Pay
  • Union Pay
  • Visa

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.